Linear Programming Multiple-Choice Quiz

Play 15 four-option questions on linear programming. Translate resource limits into constraints, check feasible plans, and use corner points to minimize cost or maximize a score.

Algebra II and introductory finite mathematics students

Question 1 of 15

$100

A model uses P = 4x + 7y for a total score. The aim is to make P as large as possible. What is P = 4x + 7y called?

Ready to play?

Open at Step 3 with every question loaded. Play solo, host live, or customize your game.

Play & Customize Game

Questions by ladder level

Level 1 · Naming what a plan optimizes

A model uses P = 4x + 7y for a total score. The aim is to make P as large as possible. What is P = 4x + 7y called?

  1. The objective function
  2. A resource constraint
  3. The feasible region
  4. A corner point
Show answer and explanation

Correct answer: A. The objective function

The objective function gives the score for each plan. The model seeks a feasible plan with the highest score.

Question reference

Level 2 · Translating a space limit

A display holds x narrow items that take 2 cm each and y wide items that take 5 cm each. The items can use at most 35 cm. Which constraint models the combined width?

  1. 2x + 5y ≥ 35
  2. 5x + 2y ≤ 35
  3. 2x + 5y ≤ 35
  4. x + y ≤ 35
Show answer and explanation

Correct answer: C. 2x + 5y ≤ 35

The two item types use 2x and 5y centimeters. Their total width can be at most 35 cm.

Question reference

Level 3 · Checking a plan for feasibility

A model accepts only nonnegative plans with x + y ≤ 7 and 3x + 2y ≤ 17. Which plan (x, y) is feasible?

  1. (5, 2)
  2. (2, 4)
  3. (0, 8)
  4. (−1, 4)
Show answer and explanation

Correct answer: B. (2, 4)

The plan (2, 4) gives 6 for the first sum and 14 for the second. The other plans respectively exceed the weighted limit, exceed the total limit, or use a negative value.

Question reference

Level 4 · Scoring one feasible plan

A feasible plan uses x = 2 and y = 5. What value does it give the objective P = 6x + 9y?

  1. 63
  2. 51
  3. 48
  4. 57
Show answer and explanation

Correct answer: D. 57

Replace x with 2 and y with 5. The score is 6 × 2 + 9 × 5 = 57.

Question reference

Level 5 · A constraint with no room left

A plan has limits x + y ≤ 9 and 2x + 4y ≤ 24. At (2, 5), which limit is binding, meaning the plan reaches that limit exactly?

  1. Only the limit of 9
  2. Only the limit of 24
  3. Both limits
  4. Neither limit
Show answer and explanation

Correct answer: B. Only the limit of 24

The first total is 7, leaving room under 9. The second total is 4 + 20 = 24, exactly at its limit.

Question reference

Level 6 · Choosing the best corner

A bounded feasible region has vertices (0, 0), (4, 0), (3, 2), and (0, 5). Which vertex maximizes P = 5x + 4y?

  1. (3, 2)
  2. (4, 0)
  3. (0, 5)
  4. (0, 0)
Show answer and explanation

Correct answer: A. (3, 2)

The four corner scores are 0, 20, 23, and 20 in the order given. The highest occurs at (3, 2).

Question reference

Level 7 · Locating a candidate that uses both resources

An outreach team can make at most 9 visits and use at most 25 staff-hours. Local visits x take 2 hours each and extended visits y take 3. Which plan uses both limits exactly?

  1. (5, 5)
  2. (7, 2)
  3. (0, 8)
  4. (2, 7)
Show answer and explanation

Correct answer: D. (2, 7)

Set x + y = 9 and 2x + 3y = 25. Subtracting twice the first equation from the second gives y = 7 and then x = 2.

Question reference

Level 8 · Comparing cost among feasible choices

An event needs at least 5 sessions, with at least 2 guided. A guided session costs 6 credits and an independent one costs 4. Which listed plan (guided, independent) meets the requirements at the lowest cost?

  1. (3, 1)
  2. (1, 4)
  3. (2, 3)
  4. (3, 2)
Show answer and explanation

Correct answer: C. (2, 3)

The feasible choices are (2, 3) and (3, 2), which cost 24 and 26 credits. The other two choices miss a minimum requirement.

Question reference

Level 9 · How a feasible switch changes the score

Both (2, 2) and (3, 1) are feasible. The objective is P = 8x + 5y. How does P change when a planner switches from (2, 2) to (3, 1)?

  1. It increases by 3.
  2. It decreases by 3.
  3. It increases by 13.
  4. It stays the same.
Show answer and explanation

Correct answer: A. It increases by 3.

The switch adds one unit of x and removes one unit of y. The change in the objective is 8 − 5 = 3.

Question reference

Level 10 · Why this model has no maximum

A model has x ≥ 0, y ≥ 0, and x + y ≥ 4. Its aim is to maximize P = x + 2y. Why does P have no finite maximum?

  1. The largest feasible y is 4, and x can never change.
  2. The constraints have no feasible plans.
  3. Every feasible plan has a score of 4.
  4. At x = 0, y can grow without limit and keep the plan feasible.
Show answer and explanation

Correct answer: D. At x = 0, y can grow without limit and keep the plan feasible.

At x = 0, every y ≥ 4 is feasible. Along that ray, P = 2y grows without limit.

Question reference

Level 11 · Two corners with the same best score

The feasible region is the polygon with corners (0, 0), (6, 0), (3, 3), and (0, 4), including its edges. Which set gives all the plans that maximize P = x + y?

  1. The entire segment from (3, 3) to (0, 4)
  2. Only the two points (6, 0) and (3, 3)
  3. The entire segment from (6, 0) to (3, 3)
  4. The entire feasible polygon
Show answer and explanation

Correct answer: C. The entire segment from (6, 0) to (3, 3)

The highest corner value is 6 at (6, 0) and (3, 3). The edge between them has x + y = 6 everywhere. The other corners score below 6.

Question reference

Level 12 · Allocating time and credits

A media room has up to 10 hours and 35 credits. An hour of audio work uses 2 credits and earns 4 points. An hour of video work uses 5 credits and earns 7 points. With fractional hours allowed, what is the highest score?

  1. 49 points
  2. 55 points
  3. 40 points
  4. 70 points
Show answer and explanation

Correct answer: B. 55 points

The two limits meet at 5 hours of each activity, for 55 points. Audio alone reaches 40 points, video alone reaches 49, and doing neither scores zero.

Question reference

Level 13 · Meeting two requirements at minimum cost

A fictional event uses x early and y late support hours, both nonnegative and allowed to be fractional. It must meet x + 2y ≥ 8 and 3x + y ≥ 9. At $5 per early hour and $4 per late hour, which plan (x, y) minimizes cost?

  1. (3, 2)
  2. (8, 0)
  3. (0, 9)
  4. (2, 3)
Show answer and explanation

Correct answer: D. (2, 3)

At each x, the least feasible y costs the least. The lower boundary has corners (8, 0), (2, 3), and (0, 9), costing $40, $22, and $36. Beyond (8, 0), more early hours only raise the cost.

Question reference

Level 14 · When a plan needs whole numbers

A club chooses nonnegative whole numbers x and y with 3x + 2y ≤ 14 and x + 2y ≤ 8. It wants to maximize P = 7x + 6y. Which plan (x, y) is best?

  1. (4, 1)
  2. (3, 3)
  3. (3, 2)
  4. (2, 3)
Show answer and explanation

Correct answer: A. (4, 1)

For x = 0, 1, 2, 3, and 4, the largest feasible y is 4, 3, 3, 2, and 1, respectively. The resulting scores are 24, 25, 32, 33, and 34. Larger x is infeasible.

Question reference

Level 15 · Measuring the gain from a larger limit

A display uses x and y hours in two modes and scores P = 5x + 3y. Hours are nonnegative and can be fractional. The limits are x + y ≤ 10 and 3x + y ≤ 18. How much does the best score rise if 18 changes to 20?

  1. 5 points
  2. 4 points
  3. 2 points
  4. 10 points
Show answer and explanation

Correct answer: C. 2 points

The old best corner is (4, 6), with 38 points. The new best corner is (5, 5), with 40 points. Both beat their respective axis corners, so the maximum rises by 2.

Question reference